PRD Template (Product Requirements Document) in Markdown
A PRD (product requirements document) states the problem and who has it, the goals and non-goals, how success is measured, and testable requirements with priorities and acceptance criteria. This Markdown template adds risks, rollout and a decision log. Copy it, download the .md file, or read the filled example below.
Free to use, no attribution required (CC0).
Updated
PRD: {{Feature or product name}}
| Status | {{Draft / In review / Approved / Shipped}} |
| Owner (PM) | {{Name}} |
| Engineering lead | {{Name}} |
| Design | {{Name}} |
| Approver | {{Name}} |
| Target release | {{YYYY-MM-DD or quarter}} |
| Last updated | {{YYYY-MM-DD}} |
TL;DR
Three sentences a busy executive can read: the problem, what we will build, how we will know it worked.
{{...}}
1. Problem
Who has the problem? How do we know (data, interviews, tickets)? What happens if we do nothing?
- Who: {{User segment}}
- Evidence: {{Data point, quote, ticket count, link}}
- Cost of inaction: {{...}}
2. Goals and non-goals
Goals
- {{Goal 1}}
- {{Goal 2}}
Non-goals (deliberately not in this release)
- {{Not doing 1, and why}}
- {{Not doing 2, and why}}
3. Users and use cases
| User | Situation | What they want to do | Outcome |
|---|---|---|---|
| {{Persona}} | {{When ...}} | {{I want to ...}} | {{So that ...}} |
4. Success metrics
A number, a baseline, a target, a date and the place you measure it.
| Metric | Baseline | Target | Measured in | Review date |
|---|---|---|---|---|
| {{Primary metric}} | {{X}} | {{Y}} | {{Tool or report}} | {{YYYY-MM-DD}} |
| {{Guardrail metric — must not get worse}} | {{X}} | {{no worse than X}} | {{...}} | {{...}} |
5. Requirements
Priority: Must / Should / Could / Won't. Acceptance criteria must be checkable by a tester.
| ID | Requirement | Priority | Acceptance criteria |
|---|---|---|---|
| R1 | {{The user can ...}} | Must | Given {{...}}, when {{...}}, then {{...}} |
| R2 | {{The system ...}} | Should | {{...}} |
| R3 | {{...}} | Could | {{...}} |
Non-functional requirements
- Performance: {{e.g. page loads in under N seconds at P95}}
- Security and privacy: {{...}}
- Accessibility: {{...}}
- Compatibility: {{browsers, devices, API versions}}
6. User flow
Optional. Replace the example with the main happy path and the main failure branch.
flowchart LR
A[User opens the feature] --> B{Has access?}
B -- Yes --> C[Completes the main task]
B -- No --> D[Sees explanation and request-access link]
C --> E[Sees confirmation]
7. Design and technical notes
- Design: {{link to mockups}}
- Technical design: {{link to design doc}}
- Analytics events to add: {{event names}}
8. Dependencies and risks
| Risk or dependency | Likelihood | Impact | Mitigation | Owner |
|---|---|---|---|---|
| {{...}} | Low / Med / High | Low / Med / High | {{...}} | {{Name}} |
9. Rollout plan
- Milestones: {{Design complete YYYY-MM-DD; Build complete YYYY-MM-DD; Launch YYYY-MM-DD}}
- Rollout: {{Internal, then N% of users, then everyone}}
- Rollback trigger: {{What result makes us roll back}}
- Communication: {{Who tells customers, support and sales}}
10. Open questions
- {{Question}} — {{Name}}, by {{YYYY-MM-DD}}
11. Decision log
| Date | Decision | Reason | Decided by |
|---|---|---|---|
| {{YYYY-MM-DD}} | {{...}} | {{...}} | {{Name}} |
# PRD: {{Feature or product name}}
| | |
|---|---|
| **Status** | {{Draft / In review / Approved / Shipped}} |
| **Owner (PM)** | {{Name}} |
| **Engineering lead** | {{Name}} |
| **Design** | {{Name}} |
| **Approver** | {{Name}} |
| **Target release** | {{YYYY-MM-DD or quarter}} |
| **Last updated** | {{YYYY-MM-DD}} |
## TL;DR
*Three sentences a busy executive can read: the problem, what we will build, how we will know it worked.*
{{...}}
## 1. Problem
*Who has the problem? How do we know (data, interviews, tickets)? What happens if we do nothing?*
- **Who:** {{User segment}}
- **Evidence:** {{Data point, quote, ticket count, link}}
- **Cost of inaction:** {{...}}
## 2. Goals and non-goals
**Goals**
- {{Goal 1}}
- {{Goal 2}}
**Non-goals** (deliberately not in this release)
- {{Not doing 1, and why}}
- {{Not doing 2, and why}}
## 3. Users and use cases
| User | Situation | What they want to do | Outcome |
|---|---|---|---|
| {{Persona}} | {{When ...}} | {{I want to ...}} | {{So that ...}} |
## 4. Success metrics
*A number, a baseline, a target, a date and the place you measure it.*
| Metric | Baseline | Target | Measured in | Review date |
|---|---|---|---|---|
| {{Primary metric}} | {{X}} | {{Y}} | {{Tool or report}} | {{YYYY-MM-DD}} |
| {{Guardrail metric — must not get worse}} | {{X}} | {{no worse than X}} | {{...}} | {{...}} |
## 5. Requirements
*Priority: Must / Should / Could / Won't. Acceptance criteria must be checkable by a tester.*
| ID | Requirement | Priority | Acceptance criteria |
|---|---|---|---|
| R1 | {{The user can ...}} | Must | Given {{...}}, when {{...}}, then {{...}} |
| R2 | {{The system ...}} | Should | {{...}} |
| R3 | {{...}} | Could | {{...}} |
### Non-functional requirements
- **Performance:** {{e.g. page loads in under N seconds at P95}}
- **Security and privacy:** {{...}}
- **Accessibility:** {{...}}
- **Compatibility:** {{browsers, devices, API versions}}
## 6. User flow
*Optional. Replace the example with the main happy path and the main failure branch.*
```mermaid
flowchart LR
A[User opens the feature] --> B{Has access?}
B -- Yes --> C[Completes the main task]
B -- No --> D[Sees explanation and request-access link]
C --> E[Sees confirmation]
```
## 7. Design and technical notes
- Design: {{link to mockups}}
- Technical design: {{link to design doc}}
- Analytics events to add: {{event names}}
## 8. Dependencies and risks
| Risk or dependency | Likelihood | Impact | Mitigation | Owner |
|---|---|---|---|---|
| {{...}} | Low / Med / High | Low / Med / High | {{...}} | {{Name}} |
## 9. Rollout plan
- **Milestones:** {{Design complete YYYY-MM-DD; Build complete YYYY-MM-DD; Launch YYYY-MM-DD}}
- **Rollout:** {{Internal, then N% of users, then everyone}}
- **Rollback trigger:** {{What result makes us roll back}}
- **Communication:** {{Who tells customers, support and sales}}
## 10. Open questions
- [ ] {{Question}} — {{Name}}, by {{YYYY-MM-DD}}
## 11. Decision log
| Date | Decision | Reason | Decided by |
|---|---|---|---|
| {{YYYY-MM-DD}} | {{...}} | {{...}} | {{Name}} |
Want to see it as a real wiki page? Open this template in the Folio demo, where it is a normal Markdown page.
How to use it
Step 1: Write the problem and the non-goals first. Fill in "Problem", "Goals" and "Non-goals" before anything else. If you cannot state the problem in three sentences, the PRD is not ready for requirements.
Step 2: Turn each requirement into something a tester can check. Give every requirement an ID, a priority and acceptance criteria. Cut or defer what you cannot make testable.
Step 3: Share the draft, then log decisions. Send the link to engineering and design, collect questions in "Open questions", and record every resolved question in the decision log so the reasoning survives the thread.
What goes into a PRD, and what makes it good
The short list. A PRD has a header (owner, status, approver, date), a three-sentence summary, the problem with evidence, goals and non-goals, users and use cases, success metrics, numbered requirements with acceptance criteria, risks and dependencies, a rollout plan, open questions and a decision log. Design and engineering details live in linked documents.
The problem comes before the solution. A PRD that opens with a feature list invites debate about the solution while nobody agrees on the problem. State who has the problem, how you know, and what happens if you do nothing.
Non-goals are as important as goals. Scope creep starts with silence. A short list of things this release deliberately does not do saves more review time than any other section.
Success is a number with a baseline and a date. "Improve onboarding" is a wish. "Raise day-7 activation from {{X}}% to {{Y}}% within {{N}} weeks of launch, measured in {{tool}}" is a target the team can lose.
Requirements are testable and prioritised. Use IDs so reviews can point at them, MoSCoW (Must, Should, Could, Won't) so cuts are quick, and acceptance criteria so "done" means the same thing to product, design and engineering.
A filled-in PRD example
The example below is a fictional feature ("Quiet hours") of a fictional team messenger called Relay. The product, the people and every number are invented to show the shape of each section; replace them with your own.
Look at three things. The non-goals name a real temptation instead of a vague "out of scope". Each metric has a baseline, a target, a place to measure it and a review date. Each requirement has acceptance criteria in given, when, then form, so a tester knows when it is done.
# PRD: Quiet hours (EXAMPLE, fictional product "Relay")
| | |
|---|---|
| **Status** | In review |
| **Owner (PM)** | Dana Okafor |
| **Engineering lead** | Mateo Silva |
| **Design** | Priya Raman |
| **Approver** | Head of Product |
| **Target release** | 2027-Q1 |
| **Last updated** | 2026-11-02 |
## TL;DR
Relay users on distributed teams get notifications at night and mute whole channels to cope, then miss real urgent messages. We will let each person set quiet hours that hold back non-urgent notifications and show a "back at 9:00" status. We will know it worked if fewer people mute channels and urgent messages still get through.
## 1. Problem
- **Who:** members of teams that span three or more time zones.
- **Evidence:** 31 of 46 interviewed users said they mute channels at night; support tags "too many notifications" on 212 tickets in the last quarter (figures are invented for this example).
- **Cost of inaction:** people mute whole channels, so urgent messages are missed, and some uninstall the mobile app.
## 2. Goals and non-goals
**Goals**
- Let a person define quiet hours per weekday in their own time zone.
- Hold back non-urgent notifications during quiet hours and deliver a digest afterwards.
- Let a sender mark a message urgent so it still breaks through.
**Non-goals**
- Team-wide quiet hours set by an admin (planned for a later release; needs a policy discussion).
- Calendar integration. Quiet hours are set by hand in this release.
- Changing email notifications. This release covers push and desktop only.
## 3. Users and use cases
| User | Situation | What they want to do | Outcome |
|---|---|---|---|
| Remote engineer | Colleagues in another time zone post in the evening | Silence pushes from 19:00 to 08:00 | Sleeps; sees a digest at 08:00 |
| On-call lead | A real emergency happens at night | Be reached even in quiet hours | Urgent message arrives |
| Teammate (sender) | Needs an answer from someone who is off | See that the person is in quiet hours | Chooses to wait or mark urgent |
## 4. Success metrics
| Metric | Baseline | Target | Measured in | Review date |
|---|---|---|---|---|
| Share of weekly active users who mute a channel | 38% | 25% | Product analytics, weekly | 2027-04-15 |
| Share of quiet-hours users | 0% | 20% of weekly active users within 8 weeks | Product analytics | 2027-04-15 |
| Guardrail: urgent messages opened within 10 minutes | 71% | no worse than 71% | Product analytics | 2027-04-15 |
## 5. Requirements
| ID | Requirement | Priority | Acceptance criteria |
|---|---|---|---|
| R1 | A user can set quiet hours for each weekday | Must | Given the settings page, when the user saves 19:00 to 08:00 for Monday, then the schedule is stored in their time zone and shown on reload |
| R2 | Non-urgent push and desktop notifications are held during quiet hours | Must | Given quiet hours are active, when a normal message arrives, then no push is sent and the message is counted for the digest |
| R3 | A sender can mark a message urgent, and urgent messages break through | Must | Given quiet hours are active, when an urgent message arrives, then a push is sent within 30 seconds |
| R4 | A digest is delivered when quiet hours end | Should | Given held messages exist, when quiet hours end, then one notification lists the count per channel |
| R5 | Others see "back at 9:00" next to a person in quiet hours | Could | The status text shows the local end time of the viewer's own time zone |
### Non-functional requirements
- **Performance:** the hold decision adds no more than 50 ms at P95 to notification delivery.
- **Privacy:** other users see only the end time, never the full schedule.
- **Accessibility:** the schedule editor works with the keyboard and a screen reader.
## 6. User flow
```mermaid
flowchart LR
A[Message sent] --> B{Marked urgent?}
B -- Yes --> C[Push now]
B -- No --> D{Recipient in quiet hours?}
D -- No --> C
D -- Yes --> E[Hold, add to digest]
```
## 7. Design and technical notes
- Design: mockups in the design file (link in the real document).
- Technical design: see the design doc example "Quiet hours scheduler".
- Analytics events to add: quiet_hours_saved, message_held, digest_sent, urgent_sent.
## 8. Dependencies and risks
| Risk or dependency | Likelihood | Impact | Mitigation | Owner |
|---|---|---|---|---|
| Senders overuse "urgent" | Med | High | Rate limit per sender; review the urgent rate after two weeks | Dana |
| Time zone changes while travelling | Med | Low | Use the device time zone, ask once on change | Priya |
| Push provider delays | Low | Med | Measure delivery time in the rollout | Mateo |
## 9. Rollout plan
- **Milestones:** design complete 2026-12-04; build complete 2027-01-22; launch 2027-02-15.
- **Rollout:** internal for one week, then 10% of users, then everyone.
- **Rollback trigger:** urgent-message open rate falls below 65%.
- **Communication:** Dana writes release notes; support gets a FAQ page before launch.
## 10. Open questions
- [ ] Should an urgent message from a manager bypass quiet hours without a mark? (Dana, by 2026-11-20)
- [ ] Do we need a weekend preset? (Priya, by 2026-11-20)
## 11. Decision log
| Date | Decision | Reason | Decided by |
|---|---|---|---|
| 2026-11-02 | Admin-set team quiet hours are out of scope | Needs a policy decision first | Dana, Head of Product |
How do I write a PRD for an AI agent to read?
Short answer: write every requirement so it can be quoted on its own. Give it a stable ID, one sentence, a priority and acceptance criteria that a test can check, state the non-goals explicitly, and use the same term for the same thing everywhere. An agent that implements or reviews work from the PRD can then cite R3 instead of guessing what "the notification thing" meant.
Three habits help most. Put a one-line scope statement and the non-goals near the top, because an agent that sees only part of the file should still see the limits. Prefer tables and numbered lists to prose for requirements. Link the design doc and the tickets with normal links, so the agent can follow them.
Keep the PRD where the agent can read it. In Folio an AI client connected over MCP can list a space, search pages with search_pages and read one with read_page, with the permissions of the token's owner; a write-scoped token can also create pages, for example from a template with create_page_from_template. The agent reads the latest saved text and the page history shows what changed. See how to connect an MCP client.
What Folio does not do here. It does not turn requirements into tickets, track their status or run an approval workflow: Status and Approver in the template are text that people keep up to date. It stores and serves the page; it cannot check that an agent followed it.
More templates
Frequently asked questions
What should a PRD include?
A summary, the problem with evidence, goals and non-goals, users and use cases, success metrics with a baseline and a target, numbered requirements with priorities and acceptance criteria, risks and dependencies, a rollout plan, open questions and a decision log. Every section in this template is one of those.
What is the difference between a PRD and a design doc?
A PRD says what to build and why, and how success is measured. A design doc says how engineering will build it. The PRD is owned by product, the design doc by engineering, and the design doc links back to the PRD's requirement IDs.
How long should a PRD be?
As long as the decision needs and no longer. A small change may fit on one page; a new product area may need several. A PRD nobody finishes reading has failed, whatever its length.
Who writes and who approves a PRD?
The product manager (or whoever owns the problem) writes it. Engineering, design and any affected stakeholder review it. Name one approver in the header so there is a person who says "go".
Is a PRD still useful for agile teams?
Yes, if it stays a living document. Keep it short, update it as scope changes, and break the requirements into tickets that reference the requirement IDs. What you drop is the idea of a frozen, signed-off specification.
How do I write a PRD that an AI agent can use?
Give every requirement a stable ID, one sentence and acceptance criteria a test can check, state the non-goals near the top, and keep terms identical across sections. Store the PRD where the agent can read it; see the section above for how that works in Folio.
Write the PRD where the team can read it, diff it and link it
In Folio a PRD is a Markdown page in Git. Requirement tables, Mermaid flow diagrams and checklists render in the editor; edits by several people appear live; and the history shows who changed which requirement and when. Link the PRD from the design doc and from tickets with a normal relative link.